Red River Floodway Bridges

Winnipeg, MB

Capitol Steel fabricated and erected 3,000 T of structural steel for two TPG rail bridges as part of the Red River Floodway Expansion project. Each span measuring 95 feet long x 22 feet wide x 9 feet deep and weighing 145 T, was fully shop assembled then shipped to the job site. As well, Capitol erected and dismantled a detour bridge, allowing train traffic to continue uninterrupted while the new bridges were built.