Low Level Road Overpass and Pedestrian Bridges

North Vancouver, BC

Capitol Steel fabricated and erected the Neptune/Cargill Overpass, and the Spirit Trail Pedestrian Bridge.

Full shop Trial Assembly for the overpass was completed to ensure seamless fit up on site, given the sensitivity of the bridge which spans a public road, a private port access road and 7 Rail Lines belonging to both CN and CP, located in the busy port of North Vancouver.

Trusses measuring 138 feet long and 15 feet in height were shipped from our facility. The bridge was then fully assembled off site in one piece and hauled to its final location and erected with a single crane pick to minimize road closure duration.

 

 