Feedermain Bridge Rehabilitation

Winnipeg, MB

Capitol Steel performed the rehabilitation of a single span steel truss bridge which spans the Assiniboine River supporting a 900 millimetre diameter water pipe. The bridge had been in service since 1956 and was at the end of its service life. Restoration work included strengthening and modifying the bridge structure.

Other Bridge Projects