Pointe du Bois Trestle Bridge

Pointe du Bois, MB

Capitol Steel fabricated and erected the structural steel for a 21 span trestle bridge which would allow heavy equipment access to the new Pointe Du Bois spillway job site.

All substructure steel was erected using a helicopter due to the site conditions. Superstructure steel was incrementally installed using a crawler crane on the deck.

Other Bridge Projects